Permit Fees

Fees

(ComDev Fee ScheduleFY2019)

ComDev Fee ScheduleFY2019

Building Permits: Fees are based on the total cost of the improvements to be made, with a minimum fee of $42.84. The fee for demolishing a structure is $52. The fee for moving a structure, including mobile homes, is $78.00. View Building Permit Fee Scale.

Mechanical Permits: Fees are based upon the cost of the work to be performed, with minimum fee of $42.84. View Mechanical Permit Fee Scale.

Electrical Permits: Fees are based upon the number and type of outlets to be installed and/or the number and size of main or sub-panels, with a minimum fee of $42.84.

Plumbing Permits: Fees are based upon the number of fixtures or devices to be installed, with a minimum fee of $42.84.

Other Fees

Amusement Device Permit Fees -  
Planning and Zoning Fees
Plan Review Fees
Sign Permit Fees (PDF)

Please add a 2% levy fee to all permits.

Inspection Fees

Fee Descriptions
Fee Amount
  • Additional inspections made necessary by undue delays in work
  • Use of improper materials or workmanship
  • Failure to have ready any required tests
  • Continued violations of the Uniform Statewide Building Code (USBC)
$29.00
  • Inspections and investigations necessary to verify work being done without the required permits
$72
  • Special inspections beyond or after normal working hours of the department
$57 for the first hour, $29.00 for each subsequent hour